School of Labor and Employment Relations Climate Jobs Institute

Illinois is deciding how to regulate data centers. A new brief from the Climate Jobs Institute looks at three communities that have already hosted them: DeKalb, home to Meta’s $4.6 billion facility; Aurora, which paused new data centers and wrote the most detailed rules in the state after residents complained about noise; and Elk Grove Village, the state’s oldest and largest cluster. 

The brief draws on a facility-by-facility database of 32 data centers, property tax records, Illinois EPA air permits, corporate accountability reports, nearly 17 hours of public meetings, Aurora’s resident survey, and interviews with local officials.  These communities’ experiences offer lessons for any Illinois community weighing a data center proposal, and for state policymakers deciding which rules should apply statewide.

Property taxes are large. From 2022 to 2024, data centers paid $88.7 million in Elk Grove Village, $46.4 million in DeKalb and $5.6 million in Aurora. DeKalb’s school district used its share to build a new school without borrowing. 

Construction jobs are many; permanent jobs are few but pay well. Elk Grove Village’s builders estimate about 1,000 construction jobs a day through 2030. Permanent jobs are fewer: the state’s 34 incentive projects committed to about 21 each. In their latest reports, companies listed 542 full-time employees earning about $120,500 a year on average, roughly 50 percent more than the average Illinois job. Most projects running since 2020–2022 have hired more permanent employees than they promised the state in exchange for incentives. 

The public record is thin. Illinois doesn’t keep a list of which data centers are operating. Of the 32 facilities we tracked in the three communities, only Meta’s DeKalb campus reports how much water and electricity it uses, and of the three communities, only Aurora requires data centers to report it (though none of those reports have been published yet). No public source measures what any facility emits. Most of what’s known is a company’s own claim or a permit’s legal limit rather than specific emissions. 

The biggest costs are regional. State energy agencies call data centers the main driver of rising electricity demand and project that the grid serving northern Illinois will fall short of the power it needs starting in 2029. The Union of Concerned Scientists estimates data centers will add $24 billion to $37 billion to Illinois’ power system costs through 2050. Those costs show up on household bills across the region, whether or not a town hosts a data center. 

Local governments hold the vote but control few of the impacts residents asked about. For most residents, the only chance to weigh in on a data center is a local zoning hearing. But electricity rates and grid costs are set by the Illinois Commerce Commission and the regional grid operator, PJM; the Illinois EPA permits backup generators; and the largest tax breaks come from the state.

Based on the three cases, the brief recommends that the state and other Illinois communities: 

  • Give local governments resources. Model ordinances, funding for expert studies, a formal way to learn from each other, and technical help to measure and enforce existing noise limits. 
  • Require public reporting. Standardized, facility-level reports on energy, water and grid impacts, published in one place, plus DCEO tracking of each project’s jobs against what it promised. 
  • Increase transparency. Ban nondisclosure agreements between data centers and local governments, and make notices, permits and reports accessible to residents. 
  • Set clean energy requirements. Require data centers to bring new clean energy built in Illinois, tie faster grid connections and tax breaks to it, and settle at the state level who pays for power and grid upgrades. 
  • Review air impacts as a whole. Look at the combined emissions of data center clusters, rather than permitting one facility at a time, especially in Environmental Justice communities. 
  • Require binding agreements. Project labor agreements should be required for all data centers, with public workforce reporting. Legally binding, public community benefits agreements should also be required. 

This research was funded by the State of Illinois through an appropriation to the Climate Jobs Institute at the University of Illinois.  

Questions: Johnathan Hettinger, hetting2@illinois.edu. 